Industrial/Manufacturing

White Labs

Asheville, NC

Overview

White Labs is a company focused on fermentation and yeast in brewing processes. Industry leading biochemists, they advance science and education for production, purity and freshness in liquid consumables.

Goal

Save 15% in water usage consumption with 0% effect on water flow rate and PSI.

Results

Installation took three hours with normal resumption of water services. Pressure and volume flow rates were tested and validated. Water services have been observed by onsite operational and facilities engineering.

Hi-Wire Brewing

90-Day Review - Asheville, NC

Overview

Hi-Wire Brewing opened in 2013, expanded to many locations and delivers suds to many States. Good Beer and Good Times is the motto. Many people say they achieve the motto daily!

Goal

Save 15% in water usage consumption with 0% effect on water flow rate and psi; become the most sustainable craft brewery in Beer City!

Results

Installation took 3.5 hours. No issues occurred during or after installation. Exactwater restored to normal water services, and optimization of the equipment began. Production levels remain the same, yet saving 1.1 MILLION gallons of water every year!

Great Notion Brewing

Portland, OR

Overview

Great Notions Brewing crafts beer for everyone! Three friendly neighbors began making IPAs, Sours, Smoothies, Hard Seltzers, Stouts, Non-alcoholic beverages and more in 2016. Some people say these beers almost drink themselves! Exactwater enjoys a visit here often!

Goal

Save 15% in water usage consumption with 0% effect on water flow rate and PSI.

Results

The main facility install took 4 hours with normal resumption of water services. Pressure and volume flow rates were tested and validated. ROI was planned for 20 months. The good news to share is ROI happened in 11 months!

Material Science Corporation

East Chicago, IN

Overview

For 60 years, MSC Corp has been world-renowned for high quality innovations in light-weight, acoustical and coated coil products. A customer-centric focus has created long lasting relationships and continued growth.

Goal

Save 20% in water usage consumption with 0% effect on water flow rate and PSI.

Results

Installation occurred over 6 hours. Pressure and volume flow rates were tested and validated at the pre-install levels. Industrial safety services were tested and production has continued at full operation 24/7.